Latest Update

-

Latest Update -

Date: 07 April 2026

 

Works have recently commenced to make the site safe and secure, including preventing ongoing unauthorised access. Initial activities include the draining of pools and a site clean-up, which commenced on Wednesday, 25 March 2026. Installation of new fencing has also begun to further secure the site and deter trespassing.

We will continue to provide updates as works progress and kindly ask that personnel carrying out their duties on site are able to do so without harassment and are not photographed without their consent.

Pool Works:

25/03/2026 - current

Pools being drained

Digging and use of sediment ponds, along with erosion and sediment controls.

The ponds are excavated and built up with small earth bunds, with silt fencing installed around the perimeter to contain water pumped from the pools, preventing runoff into local stormwater networks and allowing it to soak into the ground.

Pool before draining

Partially drained pool

Fully drained pool

Fence Works:

02/04/2026 - current

Temporary fencing installed to maintain pedestrian safety during excavation of post holes and installation of permanent fencing

Installation of posts for permanent fencing including pot holing for fence posts

Installation of permanent fence panels

Site condition 

Date: December 2025

The images below show the condition of the site as at December 2025.

These photographs are shared to provide an accurate and transparent picture of the site in its current condition. They show the extent of deterioration and vandalism that has occurred since the facility closed, including damage that affects safety, operation and maintenance.

While the site holds strong memories for many in the community, its current condition presents significant challenges in terms of repair, ongoing management and future use. These images are intended to assist with understanding the context in which planning for the site is now taking place.

Register your interest: 

You are welcome to register your interest to stay informed as the project continues to evolve. This will allow us to contact you when the standalone project website launches in early 2026 and when future engagement opportunities are confirmed.

Registering your interest does not commit you to participating in future engagement, but ensures you receive updates at key milestones.